With extensive experience in sports construction, our company specialized in 2003 in metal structures and glassware, in the world of paddle tennis.
Our professionalism, experience, combined with our constructive vision with a presence in the main tournaments of the Professional Circuit, make us the most effective and secure company in the sector.
Our human team is the leader in each of the processes for the construction, installation and maintenance of the courts, from engineers to assemblers specialized in the world of paddle tennis. We also have the support and direction of Hernán Bebé Auguste, who, as World Paddle Champion, provides the vision of an expert player.
Production time at our factory in Crevillent, 30 days maximum.
You have to allow 2 to 3 days for the installation of a court.
We can offer you 2 options for installing your courts: Installation with full MejorSet equipment (3-4 people) or installation only with a Mejor supervisor, who will guide your own local team of installers.
We have a logistics department that is responsible for finding and selecting the best freight forwarding companies to deliver your runway anywhere in the world.
Door-to-door with truck for shipments within Europe. CIF and CFR for maritime shipments.
The most important care is: cleaning, redistribution of sand, removal of fungi and moss, verification of joints. Our team will give you a little training on the necessary maintenance when delivering the court.
Both floors are good, but each one will be better adapted to the environment and conditions of your type of installation, let's give two examples:
We can divide the foundation into two sections, a perimeter wall (where we will anchor the structure) and a floor (play area or annexes around it).
The floor plan is one of the points to take into account the most, it must be a completely homogeneous surface without potholes or holes since this will affect 3 important points of your installation.